WELCOME TO BONDLADYS CORNER...WE CARRY ON HER CUSTOM OF MAKING THIS SITE YOUR 24 HOUR A DAY IRAQ NEWS ARTICLE SOURCE

THANK YOU FOR YOUR CONTINUED SUPPORT OF OUR LADY.


You are not connected. Please login or register

RECONSTRUCTION ADVANCED VERIFICATION COMPLETION RATES THROUGH A STRATEGIC PROJECT IN BABYLON

Go down  Message [Page 1 of 1]

player46


MEMBER
MEMBER

RECONSTRUCTION ADVANCED VERIFICATION COMPLETION RATES THROUGH A STRATEGIC PROJECT IN BABYLON



Baghdad - Awan
The Ministry of Construction and Housing, on Monday, to achieve "ratios completion of an advanced" in the project through a suit - Kish, and showed that the length of the road over "(12) km and at a cost of 33 billion dinars," arguing the project "one of the most strategic projects being connected central and southern governorates, with the center of the province of Babylon.
The Minister of Construction and Housing Mohammad Darraji, in a statement issued by the ministry, today, and received "Awan" a copy of it, "The ministry has attributed the completion advanced in the project through a suit Kish length (12.800) kilometers and a cost of about 33 billion dinars. "
He Darraji that "the road project suit Kish is executed by Hammurabi General and the General Authority for Roads and Bridges subsidiaries of the ministry," noting that "the most important strategic projects in the sector of roads and bridges being connects the central and southern governorates with the center of the province of Babylon, and the provinces holy Karbala and Najaf" , he continued, "also contributes to ease congestion on the winning momentum city of Hilla, as well as facilitate the movement of trade, economic and religious tourism and the movement of citizens between these provinces."
He pointed out that "the implementation of this project is according to technical specifications for highways and be Bmmaren to go and leg width (17.5 meters) for each corridor, including (10) meters for carrot moderation with the implementation through a service display (5) meters," explaining that "The road starts from the intersection of Kish suit on Highway Baghdad suit and is associated with the center of the province. "
He Darraji that "the road contains (Cool bridges including جسران main at the intersection of rail and two-channel Babylon and جسران Khaddmaan on the same channel for roads and service جسران علويان to cross the car between the sides of the road," he continued, "has also been added overpass New and (4 ) for pedestrian crossing bridges to both sides of the fact that the road serves many rural villages, "He said," The project contains (68) arch pipe for drainage and watering crops, as well as barrages half pipe and box-and Aqueduct Aqueduct service. "
The Ministry of Construction and Housing announced that, in the (June 16, 2013), "near the rehabilitation of Highway (No. 1)" stretching from Baghdad toward the province of Basra, and showed that the first phase will involve the rehabilitation of a section of Baghdad - a suit and a length of 100 km, and as pointed out that maintenance works include "re-cladding the road and furnishing and preventive action fences", revealed that the completion of road project (a suit - Kish) the end of the year.


[You must be registered and logged in to see this link.]

Back to top  Message [Page 1 of 1]

Permissions in this forum:
You cannot reply to topics in this forum